Skip to content

Home / Case Studies

Case Studies

Five installations where the specification mattered — what the plant was facing, how we engineered around it, and what changed after commissioning.

5
Documented installations
92k–155kACFM
Capacity range
11→17months
Best bag life gain
75%
Best emissions reduction

The SET

Measured Results, Not Adjectives

Every study below reports what actually changed after commissioning, in numbers. Where a figure is still being confirmed, we say so rather than filling the gap with an adjective.

Cement & Aggregates

92,000 ACFM baghouse for a Midwestern cement kiln

Bag life 11 → 17 months, maintenance hours halved

Foundry & Metal Casting

EAF fume collection upgrade at a Great Lakes steel foundry

Bag replacement frequency down 25%

Food Processing

Sanitary stainless baghouse for combustible flour and sugar dust

Capture efficiency up 7%, DHA gaps closed

Chemical Manufacturing

316L collector for corrosive, combustible chemical dust

Bag life +50%, capture efficiency +14%

Metal Recycling

Multiple ageing collectors replaced by one central system

Fugitive emissions down 75%

Facing Something Similar?

Every one of these started with a site assessment. Tell us what you’re dealing with.