Home / Case Studies
Case Studies
Five installations where the specification mattered — what the plant was facing, how we engineered around it, and what changed after commissioning.
5
Documented installations
92k–155kACFM
Capacity range
11→17months
Best bag life gain
75%
Best emissions reduction
The SET
Measured Results, Not Adjectives
Every study below reports what actually changed after commissioning, in numbers. Where a figure is still being confirmed, we say so rather than filling the gap with an adjective.
Cement & Aggregates
92,000 ACFM baghouse for a Midwestern cement kiln
Bag life 11 → 17 months, maintenance hours halved
Foundry & Metal Casting
EAF fume collection upgrade at a Great Lakes steel foundry
Bag replacement frequency down 25%
Food Processing
Sanitary stainless baghouse for combustible flour and sugar dust
Capture efficiency up 7%, DHA gaps closed
Chemical Manufacturing
316L collector for corrosive, combustible chemical dust
Bag life +50%, capture efficiency +14%
Metal Recycling
Multiple ageing collectors replaced by one central system
Fugitive emissions down 75%
Facing Something Similar?
Every one of these started with a site assessment. Tell us what you’re dealing with.